• Sustainable Process Engineering Research Team

Industrial

A2A

IN PROGRESS (2022)

Slugde HTC processing

Plant: HTC – Sites: Milano, Bolzano

SIAD Macchine Impianti

ACCOMPLISHED (2020 – 2021)

Liquid hydrogen processing

Plant: Hydrogen – Sites: EPC activity

SOL SpA

ACCOMPLISHED (2020 – 2021)

Synthetic natural gas

Plant: Waste conversion – Sites: Milano

PERI SpA

ACCOMPLISHED (2021)

Plant optimization

Plant: Biogas – Site: Melegnano (MI)

HBI Group

ACCOMPLISHED (2020 – 2021)

Technical advising for sludge HTC processing plant scale-up

Plant: HTC – Site: Bolzano

3 patents filed and transferred

San Marino Energia e Ambiente

IN PROGRESS (2020 – 2022)

Technical advising, procurement, construction

Plant: Biogas – Site: Città di Castello (PG)

TWT srl

ACCOMPLISHED (2020 – 2021)

Operations management and optimization

Plant: Biogas – Site: Grumello del Monte (BG)

AZOT

ACCOMPLISHED (2020)

Digital twin for acid nitric process (jointly with TPU)

Plant: Fertilizer – Site: Siberian O’blast, Russian Fed.

SIBUR Corporate

ACCOMPLISHED (2021)

Pyrolysis oil purification

Plant: Petrochemical – Site: Tobolsk, Russian Fed.

SIBUR Corporate

ACCOMPLISHED (2021)

Energy optimization of natural gas plant

Plant: Petrochemical – Site: Tobolsk, Russian Fed.

ACEA SpA

IN PROGRESS (2020 – 2023)

Gasiforming process

Plant: Waste conversion – Sites: Ancona, Italy

Process license conferred (2021-2036)

ITELYUM REGENERATION srl

IN PROGRESS (2020 – 2023)

Digitalization

Plant: Exhausted Oil Refinery – Sites: Pieve Fissiraga (LO), Ceccano (FR)

2 patents filed and transferred

SITIP SpA

ACCOMPLISHED (2020)

Tech transfer for medical devices

Plant: Textile fibers – Sites: Cene (BG)

Patent filed and transferred

CAPGEMINI ENGINEERING

ACCOMPLISHED (2020)

Batch process modeling, simulation and optimization

Plant: Pharma – Sites: Varese

Fattoria Autonoma Tabacchi – FAT

IN PROGRESS (2019 – 2023)

Demo-scale for BIGSQUID™

Plant: Biogas – Sites: Città di Castello

IP portion transferred

ENI SpA

ACCOMPLISHED (2019)

EST – Eni Slurry Technology

Plant: refinery – SIte: Sannazzaro de’ Burgondi (PV)

HBI Group

ACCOMPLISHED (2020)

Hydrothermal char process engineering

Plant: Slurry waste conversion – Sites: Bolzano

Patent filed and transferred

SIAD MACCHINE IMPIANTI SpA / ASPENTECH LTD

ACCOMPLISHED (2018 – 2020)

Detailed thermodynamics and CAPE-OPEN implementation

Plant: Air Separation Units – Sites: Bergamo

SAIPEM SpA

ACCOMPLISHED (2019 – 2022)

Urea Zero Emissions 2.0

Plant: Fertilizers – Sites: EPC activities

SIBUR Corporate

ACCOMPLISHED (2020)

Process Operations management

Plant: Petrochemical – Sites: Novosibirsk, Voronezh

SAIPEM SpA

ACCOMPLISHED (2018 – 2019)

Urea Zero Emissions

Plant: Fertilizers – Sites: EPC activities

ENI SpA

ACCOMPLISHED (2019)

Plastic wastes chemical recycling

Plant: refinery – SIte: Taranto

VISCOLUBE srl

ACCOMPLISHED (2017 – 2020)

AG2S™ application to oil refineries / hydrofinishing

Plant: Lubricants – Sites: Pieve Fissiraga (LO), Ceccano (FR)

BITOLEA srl

ACCOMPLISHED (2018)

Techno-feasibility study for methyl-acetate process

Plant: Lubricants – Sites: PIEVE FISSIRAGA, CECCANO

Patent filed and transferred

TECHNIPFMC

ACCOMPLISHED (2017 – 2018)

AG2S™ application to oil refineries and gas fields

Plant: oil&gas – Site: KAZAKHSTAN, SAUDI ARABIA

SIIRTECNIGI

ACCOMPLISHED (2018-2019)

Reactive CFD

Plant: LNG/SRU – Site: EPC activity, ITALY

RADICI CHIMICA SPA

ACCOMPLISHED (2016)

Pre-feasibility of industrial processes

Plant: Chemical – Site: Novara, ITALY

TECHINT SPA

ACCOMPLISHED (2016-2021)

Robust optimization

Plant: oil refinery – Site: different sites, ITALY, IRAN, EAST EU, RUSSIA

RADICI CHIMICA SPA

ACCOMPLISHED (2016)

Optimization of distillation unit

Plant: downstream/amine – Site: Novara, ITALY

SOTACARBO

ACCOMPLISHED (2015-2021)

Syngas production from acid gases and application to the S-rich coal gasification

Plant: coal/biomass gasification – Site: Carbonia, ITALY

SARTEC SpA

ACCOMPLISHED (2015-2018)

Pilot-scale project for the syngas production from acid gases

Plant: flue gas plants – Site: Sarroch, ITALY

VMGe Canada

ACCOMPLISHED (2015-2016)

Rigorous simulation of sulfur recovery units

Plant: Claus – Site: Tecnimont plants, WO

AUSTEP SpA

ACCOMPLISHED (2014-2016)

Mass and energy data reconciliation and predictive performance monitoring

Plant: Waste water treatment – Site: ACSDOBFAR, ITALY

BIOCHEMTEX SpA

ACCOMPLISHED (2013-2015)

Multi-scale modeling of the catalytic production and purification of bio-based glycols of industrial interest from polyols hydrogenolysis

Plant: Biorefinery – Site: Crescentino, ITALY

Activation of funded PhD

FBM HUDSON ITALIANA SpA

ACCOMPLISHED (2013)

Detailed simulation of thermal reactor furnace for SRUs for design purposes

Plant: Claus process – Site: Antipisnky, RUSSIA

DOW AGROSCIENCE

ACCOMPLISHED (2013-2014)

Dynamic Simulation and Optimization of Batch Distillation Column

Plant: Batch amine distillation – Site: Mozzanica (BG), ITALY

BIOCHEMTEX SpA

ACCOMPLISHED (2013-2017)

Development of Conceptual Layout and Industrial scale-up for LIDIA Biorefinery (project of the National Cluster Green Chemistry, in collaboration with Engico, Entsorga, Spike Renewables, Politecnico di Torino, Politecnico di Bari, Università di Torino)

Plant: Biorefinery – Site: ITALY

TECHINT SpA

ACCOMPLISHED (2012-2013)

Characterization of the reduction process of SO2 using methane

Plant: Sulfur recovery unit – Site: Norilsk, RUSSIA

DANIELI SpA

ACCOMPLISHED (2012-2013)

Gas-solid modeling of furnace coking and decoking phenomena

Plant: Preheater of natural gas – Site: Monterrey, MEXICO

WHIRLPOOL EUROPE Srl

ACCOMPLISHED (2012)

Dynamic simulation of the transformation processes of food matrices subject to thermal treatments

Site: ITALY

Activation of funded PhD

DG IMPIANTI

ACCOMPLISHED (2011-2012)

Modeling of non-conventional upstream units

Plant: Refinery – Site: Dijla, SYRIA

ALTRAN SpA / PEMEX

ACCOMPLISHED (2011-2012)

DCS for oil&gas

Plant: Oil refinery – Site: Salamanca and Tula, MEXICO

LINDE GAS

ACCOMPLISHED (2011-2014)

SCOOP Technology for the Corporate Bulk Supply Chain Management

Plant: Air separation units, Hydrogen – Sites: Trieste, Bologna, Terni, ITALY

Activation of funded PhD

LINDE GAS

ACCOMPLISHED (2011)

Assessment of existing Level-3 solutions

Plant: Air separation units, Hydrogen – Sites: Terni, Trieste, Bologna, Milazzo, ITALY

ENI SpA / SNAMPROGETTI

ACCOMPLISHED (2011)

Process dynamic simulation

Plant: Natural gas – Site: Kashagan, KAZAKHSTAN

POLIMERI EUROPA / ENI

ACCOMPLISHED (2011)

Online application of rigorous models

Plant: Oil refinery, petrochemical – Site: Porto Marghera, ITALY

HONEYWELL Ltd

ACCOMPLISHED (2011)

Online application of rigorous models

Plant: Petrochemical – Site: Porto Marghera, ITALY

ALTRAN SpA / SIEMENS GmbH

ACCOMPLISHED (2010-2011)

Value proposition of DCS product line to address the Italian refinery market

Site: Raffinerie di Roma, API Falconara, ISAB Impianti Sud, ITALY

CHEMPROD / LUKOIL Inc

ACCOMPLISHED (2010)

Oil refinery process simulation (hydroprocessing)

Site: Khabarovsk Refinery, RUSSIA

INVENSYS PROCESS SYSTEMS Inc USA

ACCOMPLISHED (2010)

Dynamic Optimization

Plant: Steam cracking

ERG ENERGY SpA / TECHNIP-KTI SpA

ACCOMPLISHED (2010)

Robust Data Reconciliation

Plant: Oil refinery – Site: Priolo Gargallo (SR), ITALY

SAIPEM SpA / ENI

ACCOMPLISHED (2009-2010)

Process Dynamic Simulation

Site: Nghi Son, VIETNAM

HONEYWELL Inc

ACCOMPLISHED (2009)

Plant: Ammonia (Processes: H2S MDEA-treatment, Air Compression Train, Hg Removal, etc.)

Site: QAFCO V, QATAR

SAIPEM SpA / ENI

ACCOMPLISHED (2009)

Plant: Acid Gas Injection Unit – Site: Kashgan, KAZAKHSTAN

TERMOKIMIK SpA / ENEL SpA

ACCOMPLISHED (2009)

Simulation for verification purposes of the MEA process for the CO2 sequestration in the power plant

Plant: Coke Power Plant – Site: Brindisi, ITALY

TECHNIP-KTI SpA / GALP ENERGIA Ltd

ACCOMPLISHED (2008-2009)

Integrating HYSYS, AMOCO, and VBA for the off-line nonlinear data reconciliation based on rigorous models

Plant: Sines Oil Refinery, Claus Process – Site: Porto, PORTUGAL

CHEMPROD / FOSTER WHEELER ITALIANA

ACCOMPLISHED (2008-2009)

Stripper design and steady simulation using Electrolyte and specific thermodynamic packages

Plant: H2S/Oil Stripper

TECHNIP-KTI SpA / ERG SpA

ACCOMPLISHED (2008-2009)

Developing C++ classes for the on-line data reconciliation and the outlier detection based on PRO/II simulation of the plant

Plant: ERG refinery, Claus Process – Site: Priolo Gargallo (SR), ITALY

SAUDI ARAMCO Inc / SNAMPROGETTI-ENI

ACCOMPLISHED (2007)

Development of the mass and energy data reconciliation system on KUC, KGC, KCC processes; Data coaptation and node condensation; Definition of the performance monitoring and the production accounting systems

Plant: LNG – Site: Khurais, SAUDI ARABIA

APCTECH Srl

ACCOMPLISHED (2007)

Dynamic simulation and training scenarios for grade changes, load changes, pressure peaks, plant-wide control, emergency shutdown procedures

Plant: Three-stages Let-down

DEPQUEST / CIMPROGETTI

ACCOMPLISHED (2007 – 2008)

Kinetic modeling and reactor characterization; first-principle modelling; development of a user-friendly interface for the final user

Plant: Cement hydration – Site: Tunisi, TUNISIA

INVENSYS PROCESS SYSTEMS Inc

ACCOMPLISHED (2006)

Data reconciliation, Performance monitoring, Scheduling; Setup and implementation of the daily production accounting; Rigorous modelling of final product storages (apparent volume, floating roof, foam)

Plant: Oil refinery – Site: Samir, MOROCCO

YOKOGAWA MIDDLE-EAST Ltd / SNAMPROGETTI SpA-ENI

ACCOMPLISHED (2006)

Support in modeling, data reconciliation, and outlier detection for Yokogawa Exaquantum system

Plant: LNG – Site: Al Ruwais, UNITED ARAB EMIRATES

AIR LIQUIDE SpA

ACCOMPLISHED (2005 – 2006)

Supply Chain Management, Planning, Enterprise-wide (multisite) optimization of industrial gases production and distribution in the north of Italy, Optimization of branched network and pipelines for gas oxygen transportation

Plant: Air separation – Sites: Limito and San Nazzaro de’ Borgundi, ITALY

APCTECH Srl

ACCOMPLISHED (2005)

Dynamic simulation, OTS, Development of the operator training simulation, Development of the control system, Emergency shutdown procedures

Plant: LNG

TECHNIP-KTI SpA

ACCOMPLISHED (2002 – 2004)

Development of the detailed kinetic models for sulphur compound pyrolysis and oxydation, modelling of the reaction furnace

Plant: Oil refinery, Claus process – Site: Nanjing (CHINA), Mesajeed (UAE), Mumbai (INDIA), Suez (EGYPT)

SMEA ALFALAVAL WSREFORMER SIMAM GLOBALKEY CASSA RURALE TECHINT FINCHIMICA SOL SIAD TECNIMONT AMMONIA TECNIMONT KT BH SINTEF BASF1 BASF2 ARMAGNAC GALP ITT1 ITT2 SKI HANGFENG INDIAN OIL EIL